10/22/2009 2:57 PM
Email this article Print this article  

New $21 million Pt. Marion bridge opens


This article has been read 425 times.

POINT MARION – The $21 million Point Marion Bridge project came to an end Thursday with an official ribbon cutting that opened the new span that carries Route 88 between Greene and Fayette counties over the Monongahela River.

Transportation Secretary Allen D. Biehler joined state Transportation Department District 12 Executive Joseph J. Szczur and other state and local officials at the ceremony.

Construction began on the new bridge in January 2008 and the new bridge was built south of the existing structure, allowing traffic to continue using the old span, which is scheduled for demolition later this year.

As part of the ceremony, the first vehicles to cross the new bridge were fire trucks from Bobtown, coming from the Greene County side, and fire trucks from Point Marion, coming from the Fayette County side.




Rate This Story:
1 the lowest - 5 the highest
  • 1
  • 2
  • 3
  • 4
  • 5
Current rating:
Read the complete story in tomorrow’s Observer-Reporter.




Home



1 comments

old Point Marion bridge : 10/23/2009
Why not keep the old structure as a bike-pedestrian bridge?

Dave Connelly, Durham NC
All comments will be reviewed by administrators and posted to their respective articles within 24 hours. Comments deemed inappropriate (personal attacks, name calling, vulgarity & etc.) will not be posted. When creating a comment, it is best to phrase it as your opinion. (e.g.: In my opinion ..., I think ..., I believe ...)
Subject:
Body:
Poster:
captcha f72ac3e2d7b84796a2c50da73d97a036
Enter text seen above:







Communities
Sports
Opinion
© 2010 Observer Publishing Company. All rights reserved.
This material may not be published, broadcast, rewritten or redistributed.